Engineering notes

Blog

The VEHRON blog is the project’s public engineering notes index. It is where architecture decisions, model trade-offs, validation work, and release commentary should live. The navigation now points to a real page rather than a missing target.

Architecture | Timing | 9 April 2026

Why VEHRON uses fixed multi-rate simulation

A short engineering note on why VEHRON uses fixed multi-rate scheduling, what problems it solves, and why explicit timing structure matters for reproducible simulation studies.

  • architecture
  • timing
  • simulation
Index purpose

What belongs in this blog

  • Architecture and scheduling notes
  • Battery, thermal, drivetrain, and HVAC model deep-dives
  • Validation studies and benchmark write-ups
  • Release notes and DOI/archive updates
Tags and feed

Suggested tag set

  • architecture
  • timing
  • battery
  • thermal
  • validation
  • releases

RSS can be added later, but even with one article the index should still exist and work cleanly.